Major Pharmaceutical Company
RTP, NC

Design / Construction Partnership
MY has had a long-standing design and construction partnership with a major pharmaceutical company since 1990. Over the past 12 years, MY has completed more than 1000 individual building projects with a total value in excess of $84 million for this company. MY was the major pharmaceutical company's Contractor of choice for their design-build partner to provide all design and construction services at the R&D Campus in RTP beginning in 1995, and continues today under a multi-year long term contract.

High-Tech Laboratories

MY meets the challenge of managing the design and construction of 70-100 jobs each year while setting safety achievements, realizing considerable cost-savings, and developing and maintaining ‘fast track’ schedules. Major laboratory types on campus include analytical chemistry, wet chemistry, organic and inorganic chemistry, biochemistry, Instrumentation/analytical labs, computer labs, biochemistry, radioactive research and biohazard facilities, clean room facilities, NMR, x-ray crystallography, electron microscopy, mass spectrometer, and animal holding. Recombinant DNA, bioengineering, sequencing and related lab facilities and support have been constructed as well.


Superior Safety Program

MY implemented a superior safety program that recorded 1.0 million consecutive man-hours without one lost-time injury. This extraordinary record resulted in substantial cost savings and a number of industry awards for both the major pharmaceutical company and MY.


Complex Planning
The massive scope and complexity of the multi-projects required intensive team cooperation and detailed planning. MY fostered a totally integrated, cooperative, team relationship with the major pharmaceutical company, the design-team and the trade contractors. MY’s scheduling expertise, which provided daily computerized construction information on cost, materials, productivity and manpower, kept all team members informed.

.............................................................................................................................................

High Throughput Biology Lab Renovation
Major Pharmaceutical Company
RTP, NC

Renovated 11,000 square feet of laboratory facilities. Included hazardous demolition of existing chemical fume hoods and mechanical systems. New layout facilitated increased flexibility of biology lab incorporated mobile bench space, overhead exhaust, and flexible utilities. Laboratories in the space accommodated assay, tissue culture, radiation, microscopy, and general lab functions.

.............................................................................................................................................

MSE Building 6&9
Major Pharmaceutical Company
RTP, NC


Renovated 230,000 square feet of R&D, pharmaceutical, laboratory and office space in Medicinal Safety Evaluation building. Construction included modifications to cage areas, animal holding space, prep rooms, ancillary laboratory space, and office facilities.


.............................................................................................................................................


RCII Virology FMP Renovations
Major Pharmaceutical Company
RTP, NC

R
enovated 6,000 square feet of laboratory facilities to upgrade existing space to BSL2 classification and expanded containment facilities. Renovations included new dedicated mechanical systems to provide 100 % outside air, uninterruptible and generator power, custom built hood enclosures, medical gases, and specialized lighting. Construction was phased to accommodate users requirements for occupancy and seamless transition into new facilities.


.............................................................................................................................................


Building 3 Fermentation Renovations
Major Pharmaceutical Company
RTP, NC

Renovated existing fermentation facility for installation of new equipment. Construction included installation of stainless steel piping, extension of acid waste system, steam cleaning and testing, seamless resinous flooring, and electrical.



.............................................................................................................................................


X-ray Crystallography
Major Pharmaceutical Company
RTP, NC

R
enovated existing facility to conform to tightly controlled humidification requirements. Included mechanical, electrical, process piping and controls installation. Laboratory application required expanded work space for adequate flow of work processes; accomplished by reprogramming existing equipment.



.............................................................................................................................................


Chemical Development Reactor Lab
Major Pharmaceutical Company
RTP, NC

I
nstallation of reactor vessels including process piping, intrinsic wiring and control systems. Increased capacity of building infrastructure including mechanical and plumbing services.

.............................................................................................................................................

Rack and Tunnel Washer
Major Pharmaceutical Company
RTP, NC

U
pfit of existing animal facility to install two rack and tunnel washers. Modifications included construction of clean room environment for wash down capability. Clean / dirty room construction for washers. Mechanical, plumbing and special finish requirements.

.............................................................................................................................................


Discovery Genetics Renovation
Major Pharmaceutical Company
RTP, NC


Reconfigured existing laboratory facility. Construction included removal of existing fume hood and laboratory equipment, mechanical, electrical, and controls. Installed new freezers for sample storage.



.............................................................................................................................................

Bayer Corporation
RTP, NC

Renovated and constructed approximately 18,000 square feet of laboratory used for pharmaceutical research. Project consisted of delicate demolition with critical experimentation being done by Bayer scientists adjacent to the construction area; extensive HVAC work including a new chiller and associated chilled water piping; bl-2 lab with airlock; aluminum storefront; installation of autoclaves; two cold rooms; high quality finishes of epoxy floors; epoxy resin wall & ceiling finishes; and gasketed ceiling grid system with sealed tile.

.............................................................................................................................................

Wyeth-Lederle
Sanford, NC

Constructed a 12,700 square foot lab for vaccine and pediatrics research while existing facility was fully operational.





.............................................................................................................................................

Duke University Vivarium
Durham, NC


Constructed a 20,000 square foot, two-story steel-framed building with a precast and duke stone exterior. This facility is a state-of-the-art medical instruction facility, containing operating rooms, prep and recovery rooms.





.............................................................................................................................................

Pressly Hall Lab Renovation
Raleigh, NC


Constructed a student teaching laboratory on the campus of Peace College. The project involved removal of existing finish, installation of water, gas, electrical, and HVAC service to classroom, and all new finishes.


 