Major Pharmaceutical Company
RTP, NC
Design / Construction Partnership
MY has had a long-standing design and construction partnership with a
major pharmaceutical company since 1990. Over
the past 12 years, MY has completed more than 1000 individual
building projects with a total value in excess of $84 million for this company.
MY was the major pharmaceutical company's Contractor of choice for their design-build
partner to provide all design and construction services at the
R&D Campus in RTP beginning in 1995, and continues today
under a multi-year long term contract.
High-Tech Laboratories
MY meets the challenge of managing the design and construction
of 70-100 jobs each year while setting safety achievements,
realizing considerable cost-savings, and developing and maintaining
‘fast track’ schedules. Major laboratory types on
campus include analytical chemistry, wet chemistry, organic
and inorganic chemistry, biochemistry, Instrumentation/analytical
labs, computer labs, biochemistry, radioactive research and
biohazard facilities, clean room facilities, NMR, x-ray crystallography,
electron microscopy, mass spectrometer, and animal holding.
Recombinant DNA, bioengineering, sequencing and related lab
facilities and support have been constructed as well.
Superior Safety Program
MY implemented a superior safety program that recorded 1.0
million consecutive man-hours without one lost-time injury.
This extraordinary record resulted in substantial cost savings
and a number of industry awards for both the major pharmaceutical company and MY.
Complex Planning
The massive scope and complexity of the multi-projects required
intensive team cooperation and detailed planning. MY fostered
a totally integrated, cooperative, team relationship with the
major pharmaceutical company, the design-team and the trade contractors. MY’s
scheduling expertise, which provided daily computerized construction
information on cost, materials, productivity and manpower,
kept all team members informed.
.............................................................................................................................................
High Throughput Biology Lab Renovation
Major Pharmaceutical Company
RTP, NC
Renovated
11,000 square feet of laboratory facilities. Included hazardous
demolition of existing chemical fume hoods and mechanical
systems. New layout facilitated increased flexibility of biology
lab incorporated mobile bench space, overhead exhaust, and
flexible utilities. Laboratories in the space accommodated
assay, tissue culture, radiation, microscopy, and general
lab functions.
.............................................................................................................................................
MSE
Building 6&9
Major Pharmaceutical Company
RTP, NC
Renovated 230,000 square feet of R&D, pharmaceutical,
laboratory and office space in Medicinal Safety Evaluation building.
Construction included modifications to cage areas, animal holding
space, prep rooms, ancillary laboratory space, and office facilities.
.............................................................................................................................................
RCII Virology FMP Renovations
Major Pharmaceutical Company
RTP, NC
Renovated 6,000 square feet of laboratory facilities
to upgrade existing space to BSL2 classification and expanded
containment facilities. Renovations included new dedicated mechanical
systems to provide 100 % outside air, uninterruptible and generator
power, custom built hood enclosures, medical gases, and specialized
lighting. Construction was phased to accommodate users requirements
for occupancy and seamless transition into new facilities.
.............................................................................................................................................
Building
3 Fermentation Renovations
Major Pharmaceutical Company
RTP, NC
Renovated existing fermentation facility
for installation of new equipment. Construction included installation
of stainless steel piping, extension of acid waste system, steam
cleaning and testing, seamless resinous flooring, and electrical.
.............................................................................................................................................
X-ray
Crystallography
Major Pharmaceutical Company
RTP, NC
Renovated existing facility to conform to tightly
controlled humidification requirements. Included mechanical,
electrical, process piping and controls installation. Laboratory
application required expanded work space for adequate flow of
work processes; accomplished by reprogramming existing equipment.
.............................................................................................................................................
Chemical Development Reactor Lab
Major Pharmaceutical Company
RTP, NC
Installation of reactor vessels including process
piping, intrinsic wiring and control systems. Increased capacity
of building infrastructure including mechanical and plumbing
services.
.............................................................................................................................................
Rack and Tunnel Washer
Major Pharmaceutical Company
RTP, NC
Upfit of existing animal facility to install two
rack and tunnel washers. Modifications included construction
of clean room environment for wash down capability. Clean /
dirty room construction for washers. Mechanical, plumbing and
special finish requirements.
.............................................................................................................................................
Discovery
Genetics Renovation
Major Pharmaceutical Company
RTP, NC
Reconfigured existing laboratory facility.
Construction included removal of existing fume hood and laboratory
equipment, mechanical, electrical, and controls. Installed new
freezers for sample storage.
.............................................................................................................................................
Bayer Corporation
RTP, NC
Renovated and constructed approximately 18,000
square feet of laboratory used for pharmaceutical research.
Project consisted of delicate demolition with critical experimentation
being done by Bayer scientists adjacent to the construction
area; extensive HVAC work including a new chiller and associated
chilled water piping; bl-2 lab with airlock; aluminum storefront;
installation of autoclaves; two cold rooms; high quality finishes
of epoxy floors; epoxy resin wall & ceiling finishes; and
gasketed ceiling grid system with sealed tile.
.............................................................................................................................................
Wyeth-Lederle
Sanford, NC
Constructed
a 12,700 square foot lab for vaccine and pediatrics research
while existing facility was fully operational.
.............................................................................................................................................
Duke
University Vivarium
Durham, NC
Constructed a 20,000 square foot,
two-story steel-framed building with a precast and duke stone
exterior. This facility is a state-of-the-art medical instruction
facility, containing operating rooms, prep and recovery rooms.
.............................................................................................................................................
Pressly
Hall Lab Renovation
Raleigh, NC
Constructed a student teaching laboratory
on the campus of Peace College. The project involved removal
of existing finish, installation of water, gas, electrical,
and HVAC service to classroom, and all new finishes.
|