| |
Meadowmont
Village Center
Chapel Hill, NC
Provided pre-construction
and construction services for this mixed use project that consisted
of eight separate buildings. The Town Square includes 125,000
square feet of retail space with 24 high-end residential units
located above the retail space and 102,400 square feet of office
space.
.............................................................................................................................................
Piedmont
Air Conditioning
Raleigh, NC
Constructed a 29,000 square foot office, shop,
and warehouse complex for the Piedmont Air Conditioning's Headquarters.
This two story steel-framed structure featured a masonry and
storefront exterior. Project included a complete site package.
.............................................................................................................................................
Enterprise
IV
Morrisville, NC
Built this 150,000 square foot steel
framed “flex” building less than seven months. The
tilt-up concrete panel building. Used state-of-the-art laser-screed
technology for the super-flat floor slabs.
.............................................................................................................................................
Willow
Creek
Carrboro, NC
Constructed the 40,000 square foot, 2 story multi-tenant
office building with basement level parking in nostalgic Carrboro.
The project includes structural steel and concrete with "Old
Durham" brick veneer to mock the old town character of
the historic downtown.
.............................................................................................................................................
St. Bernadette
Fuquay-Varina, NC
Constructed this 12,000
square-foot addition to an existing church. This steel-framed
addition has a masonry and stained glass window exterior with
a complex heavy timber exposed truss system. This facility includes
a 600-person sanctuary, a day chapel, and extensive site work.
.............................................................................................................................................
West
Clayton Elementary School
Clayton, NC
Constructed this 30,000
square foot addition that includes a classroom building, gymnasium
and auditorium/multipurpose area, and boiler room addition.
Worked in the existing building included renovation of existing
classrooms, kitchen and cafeteria while the building was occupied.
.............................................................................................................................................
Meadow
K-8 School
Meadow, NC
Constructed this 30,000 square foot
addition while the building was occupied including a new gymnasium,
classrooms, and music and science rooms. Other work included
demolition of site utilities, old classrooms and gym and extensive
renovation of existing classrooms.
.............................................................................................................................................
Cary
Community Center
Cary, NC
Constructed the 29,000
square foot recreational facility/community center located in
Fred G. Bond Park. This facility features classrooms, meeting
rooms, a covered walk and patio, and a single multipurpose gymnasium
with two basketball courts with complex masonry and exposed
glue-laminated heavy timber trusses.
.............................................................................................................................................
Shannon
Oaks
Cary, NC
Constructed this 58,000 square foot,
Class “A” office building at the corner of Cary
Parkway and Kildaire Farm Road. This steel framed building features
an intricate precast concrete panel and storefront exterior.
.............................................................................................................................................
Glenwood
Center
Raleigh, NC
Located in the Glenwood South District,
this 18,000 square foot Class A mixed office and retail building
presented the unique challenge of a tight site.
.............................................................................................................................................
A.E. Finley Foundation Office Building
Office
building with structural steel and concrete slab-on deck structure,
wood framing with brick veneer. High end finishes included slate
roof w/ copper gutter system, bronze/iron
ornamental railing, 12'-0" ceilings, extensive cherry millwork
including custom cherry cabinetry, granite countertops, polished
brass elevator with cherry paneling, 9 piece cornice, custom
solid 6 panel cherry doors/frames, brazilian walnut flooring
with inlay border, fiber optic accent lighting w/ elaborate
dimming systems and ornate display hall.
|
|
|
|
|